The lugs are mostly filed,the remaining dreck is gone from tubes.
The front triangle was placed back in the jig, and fell right into place - it looks like everything went together evenly.
The head tube and seat tube are cut to length and rough filed (not faced).
Started to fit chain stays.
It's beginning to look like a bike.
For the curious, at this point, the front triangle is 1.25 KG.
1 comment:
Hey! great article. very helpful. The information is very well written and very well explained. Thank you for sharing.carbon road heelset
Post a Comment