Here are some views of the Bottom Bracket. The head and seat tubes were pinned in place on the jig. Then the assembly was removed from the jig and placed in a stand to braze the joints. After the downtube cooled, the alignment was inspected and an adjustment was made to the seat tube. Then the Seat tube was brazed.
Saturday, April 08, 2006
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment